MTRC’S South Island Line(East)902 Contractor: Nishimatsu Construction., Ltd
Hong Kong Container Terminal No.9 Project
Contractor: Hyundai Eng. & Cost Co., Ltd
Wan Chai Development Phase II, Central-Wan Chai Bypass C001 & C002
Contractor: Sambo Engineering & Construction., Ltd
Wan Chai Development Phase II Central-Wan Chai Bypass Tunnel
Contractor: Sambo Engineering & Construction., Ltd
Ma Tau Wai and To Kwa Wan Stations and Tunnels SCL-1109
Contractor: Sambo Engineering & Construction., Ltd
Hong Kong Asia Container Ltd (Year 2004-Up to Now)
MTR Shatin to Central Link, Exhibition Station SCL-1123
Contractor: Sambo Engineering & Construction Co., Ltd
Hong Kong-Zhuhai-Macao Bridge Related Hong Kong Projects
Contractor: Sambo Engineering & Construction Co., Ltd
Wan Chai Development Phase II Central-Wan Chai Bypass Tunnel,
(North Point Section) C019 Island Eastern (2011 Sept –Up to Now)
Contractor: Sambo Engineering & Construction Co.,Ltd
Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road HY/2011/09
Contractor: Dragages-China Harbour-VSL Joint Venture
Hong Kong International Airport 3-Runway System Deep Cement Mixing Works
Contractor: Penta-Ocean-China State-Dong-Ah GE Joint Venture (Contract 3201)
Samsung C&T Corporation-Build King Joint Venture (Contract 3202)
Sambo E&C, CRBC, Bachy Soletanche (Contract 3203, 3204, 3205)